{"data":{"id":"us-ut/utah-code-63b-1-311","jurisdiction":"us-ut","citation":"Utah Code § 63B-1-311","heading":"Cost of acquiring or constructing facility.","body":"The cost of acquiring or constructing any facility shall be considered to include the following:\n(1) the actual cost of acquiring or improving real estate;\n(2) the actual cost of enlarging, constructing, reconstructing, improving, replacing, restoring, renovating, maintaining, equipping, or furnishing all or any part of a facility, including architects' or engineers' fees; and\n(3) all expenses connected with the authorization, sale, and issuance of the obligations to finance the acquisition or construction, including:\n(a) fees for outside attorneys or accountants whose opinions are required to secure the issuance of those obligations;\n(b) financial advisors' fees and commissions;\n(c) printing costs;\n(d) those amounts that the authority considers necessary to establish bond reserves and maintenance, repair, replacement, and contingency funds and accounts; and\n(e) the interest on these obligations for a reasonable time before, during, and for a reasonable period of time after, completion of the acquisition or construction.","path":["Title 63B Bonds","Chapter 63B-1 General Provisions","Part 63B-1-3 State Building Ownership Authority Act"],"source_url":"https://le.utah.gov/xcode/Title63B/Chapter1/63B-1-S311.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:33Z","sha256":"595b972c90c501e974d80c993ae605a54da1d995d7ca17dcffc7d3423463a6ed","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-63b-1-310","next":"us-ut/utah-code-63b-1-312"},"notice":"GroundRules: Original legal text. Not legal advice."}
