{"data":{"id":"us-ut/utah-code-73-10f-2","jurisdiction":"us-ut","citation":"Utah Code § 73-10f-2","heading":"Bear River feasibility studies.","body":"(1) The division is directed to undertake a study of the feasibility of developing the Bear River. This study shall include the following components:\n(a) an assessment of present water supplies, uses, and rights and future water needs in counties within the Bear River Basin and along the Wasatch Front;\n(b) an evaluation of alternative dam and reservoir sites;\n(c) a review of preliminary design work;\n(d) an update of the cost estimates;\n(e) an assessment of environmental impacts;\n(f) water quality analyses; and\n(g) financial and economic analyses.\n(2) The division shall:\n(a) report to the task force on the progress of the studies upon the request of the chairmen; and\n(b) report its interim conclusions and recommendations to the task force by October 31, 1990, and its final conclusions and recommendations by October 31, 1991.","path":["Title 73 Water and Irrigation","Chapter 73-10f Bear River Development"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter10f/73-10f-S2.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"dc2ee84a314d291c47c04076a80b722555336cfa6fb163e9ba027d2bd6b3265d","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-10f-1","next":"us-ut/utah-code-73-10g-102"},"notice":"GroundRules: Original legal text. Not legal advice."}
