{"data":{"id":"us-ut/utah-code-73-10g-403","jurisdiction":"us-ut","citation":"Utah Code § 73-10g-403","heading":"Work plan.","body":"(1)\n(a) By no later than November 30, 2023, and before developing the integrated water assessment under Section 73-10g-402, the division shall create a plan for developing and implementing the integrated water assessment.\n(b) In creating the work plan, the division shall consult with the entities described in Subsection 73-10g-402(4)(a).\n(2) The work plan shall include in relationship to the Great Salt Lake watershed:\n(a) a synthesis of available information, literature, and data, and an assessment of scientific, technical, measurement, and other informational needs, relating to:\n(i) water quantity, water quality, water use, and water demand;\n(ii) improving quantification and quality of data for:\n(A) surface and groundwater water diversions;\n(B) depletions; and\n(C) return flow;\n(iii) developing, downscaling, or otherwise updating models and assessment tools to improve understanding of water supply, water use, and water availability;\n(iv) understanding changing watershed conditions, including changes in climate, evapotranspiration, and other water supply vulnerabilities; and\n(v) other matters as the division determines to be appropriate; and\n(b) a description of how the work plan shall be implemented to address the needs described in Subsection (2)(a), including:\n(i) prioritize proposed activities, such as monitoring data infrastructure needs, studies, analyses, and development of tools necessary to implement the integrated water assessment;\n(ii) an implementation schedule, with completion of an integrated water assessment by no later than November 30, 2026;\n(iii) recommendations and a cost assessment for the implementation of the work plan;\n(iv) public engagement process;\n(v) an agreed approach to facilitate integrated watershed management and coordination across local, state, and federal agencies; and\n(vi) other matters as the division determines to be appropriate.","path":["Title 73 Water and Irrigation","Chapter 73-10g Water Infrastructure and Long-term Planning","Part 73-10g-4 Great Salt Lake Watershed Integrated Water Assessment"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter10g/73-10g-S403.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"8922825013cd85b05a0e8b64562f54f106e0c173c888005437218df98d42a280","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-10g-402","next":"us-ut/utah-code-73-10g-404"},"notice":"GroundRules: Original legal text. Not legal advice."}
