{"data":{"id":"us-ut/utah-code-73-23-2","jurisdiction":"us-ut","citation":"Utah Code § 73-23-2","heading":"Appropriation -- Projects authorized.","body":"(1) There is appropriated from the Water Resources Conservation and Development Fund $30,000,000 to the following agencies for fiscal year 1985-86 to pay all or any portion of any of the following projects, including but not limited to:\n(a) To the Division of Water Resources to pay for all or any\nportion of the West Desert Pumping Project, Bare Bones\nWest Desert Pumping$60,000,000\n(b) To the Disaster Relief Board for allocation to the appropriate\nentities to pay for all or any portion of any diking or other flood\ndamage or mitigation costs as determined by the board with the\nconcurrence of the governor, including, but not limited to:\nimplementing the finger diking project in Salt Lake County,\nraising the breakwaters around the Great Salt Lake Marina and\ndiking the east side of the parking lot, raising the AMAX North\ndike to protect I-80, raising the American Salt Company dike,\nraising the South Davis WWTP - North Plant dikes, diking the\nLittle Mountain WWTP, and diking the Corinne Sewage Lagoon$10,000,000\n(c) To the Division of Water Resources for preconstruction design\nstudies for a state water plan for upstream water development$500,000\n(d) To the Division of Water Resources to pay for the engineering\nand design work for the interisland diking projects (diking from\nAntelope Island to Fremont Island and from Fremont Island to\nPromontory Point) by July 1, 1987.$1,200,000\n(2) All money provided under this chapter shall be nonlapsing and may be used for all acquisitions and construction costs, including, without exclusion or limitation, operation and maintenance, the cost of acquiring land, interests in land, easements and rights-of-way, the cost of improving sites, and of acquiring, constructing, equipping, and furnishing facilities and all structures, roads, utilities, and improvements necessary, incidental, or convenient to the facilities and all related engineering, architectural, and legal fees.","path":["Title 73 Water and Irrigation","Chapter 73-23 West Desert Pumping Project"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter23/73-23-S2.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"42d7e37667fa254e7179936d3367ced999dcb87201b64536f4ad7d3145e26efe","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-23-1","next":"us-ut/utah-code-73-23-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
