{"data":{"id":"us-ut/utah-code-73-23-5","jurisdiction":"us-ut","citation":"Utah Code § 73-23-5","heading":"Interim committee study responsibilities of Division of Water Resources.","body":"The Division of Water Resources shall:\n(1) evaluate the first year's operation of the West Desert Pumping Project;\n(2) define the operational range and limitations of the West Desert Pumping Project as an emergency flood control project;\n(3) assess the feasibility of developing a cooperative ownership, operation, and maintenance plan for the project with public and private entities;\n(4) identify long-term water development opportunities upstream of the Great Salt Lake; and\n(5) report their findings to the Energy, Natural Resources and Agriculture Interim Committee before October 1, 1988.","path":["Title 73 Water and Irrigation","Chapter 73-23 West Desert Pumping Project"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter23/73-23-S5.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"f64206092558461b567cbb8b5727d8fc1d479b7fe555ec139602d2f7e61c43b7","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-23-4","next":"us-ut/utah-code-73-23-6"},"notice":"GroundRules: Original legal text. Not legal advice."}
