{"data":{"id":"us-ut/utah-code-73-26-104","jurisdiction":"us-ut","citation":"Utah Code § 73-26-104","heading":"Bear River development projects.","body":"(1) The division shall:\n(a) develop the surface waters of the Bear River and its tributaries through the planning and construction of reservoirs and associated facilities as authorized and funded by the Legislature;\n(b) own and operate the facilities constructed; and\n(c) market the developed waters.\n(2) Potential projects include:\n(a) Hyrum Dam;\n(b) Avon;\n(c) Mill Creek;\n(d) Oneida Narrows;\n(e) North Eden Creek;\n(f) Washakie; and\n(g) an interconnection from the Corinne area to Willard Reservoir.\n(3) The division may develop sites other than those listed in Subsection (2) if those projects are authorized and funded by the Legislature.\n(4) The purchase of real property does not constitute water development.","path":["Title 73 Water and Irrigation","Chapter 73-26 Bear River Development Act","Part 73-26-1 State to Develop the Bear River"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter26/73-26-S104.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"3f810afdfeef542b4fe87f9c988fba6de2dc9dfdd9d7e7be69b73c0ca2976938","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-26-103","next":"us-ut/utah-code-73-26-105"},"notice":"GroundRules: Original legal text. Not legal advice."}
