{"data":{"id":"us-ut/utah-code-73-26-502","jurisdiction":"us-ut","citation":"Utah Code § 73-26-502","heading":"Analysis of benefits and costs -- Allocation of costs.","body":"The division shall:\n(1) identify the uses and calculate the economic benefits and costs of the developed water; and\n(2) allocate project costs according to the following purposes:\n(a) municipal and industrial;\n(b) agricultural;\n(c) hydropower;\n(d) recreation;\n(e) fish and wildlife; and\n(f) flood control.","path":["Title 73 Water and Irrigation","Chapter 73-26 Bear River Development Act","Part 73-26-5 Financing and Cost Recovery"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter26/73-26-S502.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"014a570121958bed436fa9b269ebcba46b2094057dbb563b850039086d1ba22a","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-26-404","next":"us-ut/utah-code-73-26-503"},"notice":"GroundRules: Original legal text. Not legal advice."}
