{"data":{"id":"us-ut/utah-code-73-28-403","jurisdiction":"us-ut","citation":"Utah Code § 73-28-403","heading":"Water and electricity charges.","body":"The board, in consultation with the committee, shall establish prices for the developed water sold to the districts and electricity sufficient to:\n(1) recover the reimbursable preconstruction costs, construction costs, and interest on those costs within the time period specified in Section 73-28-402;\n(2) pay for operation and maintenance costs;\n(3) accumulate an adequate reserve for repair and replacement; and\n(4) allocate the proportionate cost of the project facilities required to deliver the developed water to each district.","path":["Title 73 Water and Irrigation","Chapter 73-28 Lake Powell Pipeline Development Act","Part 73-28-4 Financing and Cost Recovery"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter28/73-28-S403.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"1ec1b96f56f5b8875b170d22b00a0e474ce92c0966bcf4ac86349bbd9be70faa","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-28-402","next":"us-ut/utah-code-73-28-404"},"notice":"GroundRules: Original legal text. Not legal advice."}
