{"data":{"id":"us-ut/utah-code-73-3b-205","jurisdiction":"us-ut","citation":"Utah Code § 73-3b-205","heading":"Issuance of recovery permit -- Criteria -- Conditions.","body":"The state engineer:\n(1) shall issue the recovery permit if the state engineer determines that:\n(a) the proposed recovery of artificially recharged water will not impair any existing water right;\n(b) the applicant is the holder of an approved recharge permit or recovery permit, or if the applicant does not hold the recharge permit, has a valid agreement with the owner of the recharge permit to divert and use the recovered water; and\n(c) the recovery point of diversion is located within the area of hydrologic impact of the recharge project, as determined by the state engineer; and\n(2) may attach to the permit any conditions the state engineer determines are appropriate.","path":["Title 73 Water and Irrigation","Chapter 73-3b Groundwater Recharge and Recovery Act","Part 73-3b-2 Recharge and Recovery Permits"],"source_url":"https://le.utah.gov/xcode/Title73/Chapter3b/73-3b-S205.html","current_through":"2026 General Session","vintage":"","retrieved_at":"2026-09-03T11:34:34Z","sha256":"c2817b1ea7977402db35bd000e97d3794dd952f17c4bcc40bbbb2d76e4d6927e","source_id":"us-ut","stale":false,"prev":"us-ut/utah-code-73-3b-204","next":"us-ut/utah-code-73-3b-206"},"notice":"GroundRules: Original legal text. Not legal advice."}
