{"data":{"id":"us-va/12vac5-590-260","jurisdiction":"us-va","citation":"12VAC5-590-260","heading":"Issuance of the operation permit","body":"A. Upon receipt of the statement of completion of construction, receipt of all required certifications and test results, inspection by the department to ensure that the project has been satisfactorily completed in accordance with the approved design documents, and verification that bacteriological test results comply with the requirements set forth in Part II of this chapter, as appropriate, the commissioner will issue an operation permit.\n\nB. The owner shall not operate a waterworks without first having obtained an operation permit except as provided in 12VAC5-590-290.\n\nC. The commissioner shall establish the type (community waterworks, NTNC, or TNC), classification, and permitted capacity of the waterworks and specify these on the operation permit. Conditions may be included with the permit for operator, monitoring, and reporting requirements.","path":["Title 12. Health","Agency 5. Department of Health","Chapter 590. Waterworks Regulations","Part I. General Framework for Waterworks Regulations","Article 3. Procedures [Repealed]"],"source_url":"https://law.lis.virginia.gov/admincode/title12/agency5/chapter590/section260/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:50:40Z","sha256":"1a8881c012e92901829e7c2caaab879ef36d3aff76e69bd27029f290a98419d9","source_id":"us-va-vac","stale":false,"prev":"us-va/12vac5-590-250","next":"us-va/12vac5-590-270"},"notice":"GroundRules: Original legal text. Not legal advice."}