{"data":{"id":"us-va/12vac5-610-599.1","jurisdiction":"us-va","citation":"12VAC5-610-599.1","heading":"Emergency pumping and hauling","body":"When serious malfunctioning of an existing sewage disposal system, sewerage system or treatment works occurs, pumping and hauling may be authorized for a definite time period until the malfunctioning system can be reconstructed or repaired.","path":["Title 12. Health","Agency 5. Department of Health","Chapter 610. Sewage Handling and Disposal Regulations","Part IV. Site Limitations","Article 4. Pump and Haul of Sewage"],"source_url":"https://law.lis.virginia.gov/admincode/title12/agency5/chapter610/section599.1/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:50:45Z","sha256":"c1a95d27b59883029a86486cd9749610dd4537ca28beeba3d0db84775e4459b8","source_id":"us-va-vac","stale":false,"prev":"us-va/12vac5-610-599","next":"us-va/12vac5-610-599.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
