{"data":{"id":"us-va/12vac5-610-599.3","jurisdiction":"us-va","citation":"12VAC5-610-599.3","heading":"Permanent pump and haul","body":"Permanent pumping and hauling of sewage may be permitted under the following conditions:\n\n1. That the government entity enter into a contract with the department setting forth that the government entity will provide pump and haul services, either directly or through a private contractor holding a sewage handling permit, to the home(s), commercial establishment(s) or occupied structure(s) for the period the occupied structure is utilized or until connection can be made to an approved sewerage facility;\n\n2. Upon completion of the contract between the department and the government entity, the commissioner shall issue a single pump and haul permit to the government entity. A separate construction permit shall be issued to the government entity for each sewage storage facility. The sewage storage facility(s) shall be designed and constructed in accordance with Article 7 (12VAC5-610-990 et seq.) of Part V of this chapter; and\n\n3. When the government entity provides the sewage pump and haul services, it shall conform to the conditions contained in 12VAC5-610-380 and Article 8 (12VAC5-610-1020 et seq.) of Part V of this chapter.","path":["Title 12. Health","Agency 5. Department of Health","Chapter 610. Sewage Handling and Disposal Regulations","Part IV. Site Limitations","Article 4. Pump and Haul of Sewage"],"source_url":"https://law.lis.virginia.gov/admincode/title12/agency5/chapter610/section599.3/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:50:45Z","sha256":"8fd773308168b08f2853c535088248a16b0ac0821d8277f19860fc8b74387499","source_id":"us-va-vac","stale":false,"prev":"us-va/12vac5-610-599.2","next":"us-va/12vac5-610-600"},"notice":"GroundRules: Original legal text. Not legal advice."}
