{"data":{"id":"us-va/20vac5-318-40","jurisdiction":"us-va","citation":"20VAC5-318-40","heading":"Minimum requirements for collection of evaluation, measurement, and verification data","body":"A. In all filings required by 20VAC5-318-30, the  sources of all data or estimates used as inputs for proposed DSM measures or programs, in descending order of preference, shall be:\n\n1. Utility-specific data;\n\n2. Virginia-specific data if utility-specific data is unavailable or  impracticable. When Virginia-specific data is used, the utility shall provide an explanation as to why utility-specific data is unavailable or  impracticable;\n\n3. Data from non-Virginia jurisdictions or sources, if neither utility-specific data nor Virginia-specific data is available or  practicable:\n\na. When data from non-Virginia jurisdictions or sources is used, the utility shall provide an explanation as to why utility-specific data is unavailable or  impracticable.\n\nb. When data from non-Virginia jurisdictions or sources is used, the utility shall provide an explanation as to why Virginia-specific data is unavailable or  impracticable as well as the sources of all data, to include:\n\n(1) Titles, version numbers, publication dates, and page numbers of all source documents, as appropriate; and\n\n(2) An explanation as to why, in the utility's assessment, use of this data is appropriate.\n\nB. EM\u0026V  reports shall include  relevant workpapers, support documents, assumptions, and equations used in developing the  measurement and verification methodologies of measures or programs reported.\n\nC. EM\u0026V  reports shall include measure-level estimates of kilowatt, kilowatt-hour,  dekatherm, and pipeline capacity savings as appropriate. An estimate that has been adjusted for free-ridership as well as an estimate that has not been adjusted for free-ridership should be included as appropriate.\n\nD. Generally, EM\u0026V  of DSM programs or measures should comply, as appropriate, with Options A, B, C, or D from the International Performance Measurement and Verification Protocol  (January 2012). However, the commission recognizes that each utility has unique characteristics, and new or modified DSM measures are constantly being developed. As such, alternative methodologies may be considered with sufficient supporting documentation and explanation of appropriateness.\n\nE. Utilities are encouraged to consider use of emerging technologies, including \"advanced measurement and verification\" or \"evaluation, measurement and verification 2.0\" when appropriate and cost effective.","path":["Title 20. Public Utilities And Telecommunications","Agency 5. State Corporation Commission","Chapter 318. Rules Governing the Evaluation, Measurement, and Verification of the Effects of Utility-Sponsored Demand-Side Management Programs"],"source_url":"https://law.lis.virginia.gov/admincode/title20/agency5/chapter318/section40/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:53:27Z","sha256":"29ea5eaa89344e039e760bf40899a588ec34db9d3c14761750c7bfa3d9d343f4","source_id":"us-va-vac","stale":false,"prev":"us-va/20vac5-318-30","next":"us-va/20vac5-318-50"},"notice":"GroundRules: Original legal text. Not legal advice."}
