{"data":{"id":"us-va/4vac25-130-777.12","jurisdiction":"us-va","citation":"4VAC25-130-777.12","heading":"Preapplication conference","body":"Prior to submitting an application for a coal surface mining permit, all maps and plans shall be reviewed in the field at the proposed mining site with the division inspector assigned to the area to be mined. Two copies of a pre-inspection report shall be completed by the inspector. One copy shall be transmitted to the applicant, and one copy kept in the division office.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 130. Coal Surface Mining Reclamation Regulations","Part 777. General Content Requirements for Permit Applications"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter130/section777.12/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:14Z","sha256":"ef9885e4f0b39cdb821116a11aea06157d5507547eb40393a8aead3ee3f45347","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-130-777.11","next":"us-va/4vac25-130-777.13"},"notice":"GroundRules: Original legal text. Not legal advice."}
