{"data":{"id":"us-va/4vac25-130-778.21","jurisdiction":"us-va","citation":"4VAC25-130-778.21","heading":"Proof of publication","body":"A copy of the newspaper advertisement of the application for a permit, significant revision of a permit, or renewal of a permit, and proof of publication of the advertisements which is acceptable to the division shall be filed with the division and made a part of the application no later than 4 weeks after the last date of publication as required by 4VAC25-130-773.13(a)(1).","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 130. Coal Surface Mining Reclamation Regulations","Part 778. Permit Applications-Minimum Requirements for Legal, Financial, Compliance, and Related Information"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter130/section778.21/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:15Z","sha256":"95fa8bbfef36ff9e86d0c2ec2f343ae6879899633adae1c22fc2fc57183f7997","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-130-778.18","next":"us-va/4vac25-130-778.22"},"notice":"GroundRules: Original legal text. Not legal advice."}
