{"data":{"id":"us-va/4vac25-130-784.19","jurisdiction":"us-va","citation":"4VAC25-130-784.19","heading":"Underground development waste","body":"Each application shall contain descriptions, including appropriate maps and cross-section drawings, of the proposed disposal methods and sites for placing underground development waste and excess spoil generated at surface areas affected by surface operations and facilities, according to 4VAC25-130-817.71 through 4VAC25-130-817.75. These plans shall describe the geotechnical investigation, design, construction, operation, maintenance and removal, if appropriate, of the site and structures, and be prepared according to 4VAC25-130-780.35.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 130. Coal Surface Mining Reclamation Regulations","Part 784. Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter130/section784.19/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:16Z","sha256":"dd8c4c5f5e81fbc86dfd950a31cb53b3fe8a5103dd8f398d907174081c3236c2","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-130-784.18","next":"us-va/4vac25-130-784.20"},"notice":"GroundRules: Original legal text. Not legal advice."}
