{"data":{"id":"us-va/4vac25-130-817.122","jurisdiction":"us-va","citation":"4VAC25-130-817.122","heading":"Subsidence control; notice","body":"At least six months prior to mining, or within that period if approved by the division, the permittee shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the permittee's subsidence control plan may be examined.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 130. Coal Surface Mining Reclamation Regulations","Part 817. Permanent Program Performance Standards—Underground Mining Activities"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter130/section817.122/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:19Z","sha256":"47a74a6d3316fec8a85800f09b997c950507289f4fc413ba32d241f0d3cac70c","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-130-817.121","next":"us-va/4vac25-130-817.131"},"notice":"GroundRules: Original legal text. Not legal advice."}
