{"data":{"id":"us-va/4vac25-130-828.11","jurisdiction":"us-va","citation":"4VAC25-130-828.11","heading":"In situ processing; performance standards","body":"(a) The person who conducts in situ processing activities shall comply with Part 817 and this section.\n\n(b) In situ processing activities shall be planned and conducted to minimize disturbance to the prevailing hydrologic balance by:\n\n(1) Avoiding discharge of fluids into holes or wells, other than as approved by the division;\n\n(2) Injecting process recovery fluids only into geologic zones or intervals approved as production zones by the division;\n\n(3) Avoiding annular injection between the wall of the drill hole and the casing; and\n\n(4) Preventing discharge of process fluid into surface waters.\n\n(c) Each person who conducts in situ processing activities shall submit for approval as part of the application for permit under 4VAC25-130-785.22, and follow after approval, a plan that ensures that all acid-forming, toxic-forming, or radioactive gases, solids, or liquids constituting a fire, health, safety, or environmental hazard and caused by the mining and recovery process are promptly treated, confined, or disposed of, in a manner that prevents contamination of ground and surface waters, damage to fish, wildlife, and related environmental values, and threats to the public health and safety.\n\n(d) Each person who conducts in situ processing activities shall prevent flow of the process recovery fluid:\n\n(1) Horizontally beyond the affected area identified in the permit; and\n\n(2) Vertically into overlying or underlying aquifers.\n\n(e) Each person who conducts in situ processing activities shall restore the quality of affected ground water in the permit and adjacent area, including ground water above and below the production zone, to the approximate premining levels or better, to ensure that the potential for use of the ground water is not diminished.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 130. Coal Surface Mining Reclamation Regulations","Part 828. Special Permanent Program Performance Standards—In Situ Processing"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter130/section828.11/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:20Z","sha256":"95a3b9f7ee132272eee32949e33c21d5b7f7b1ae7ad96e177a96705efe1fd878","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-130-828.2","next":"us-va/4vac25-130-828.12"},"notice":"GroundRules: Original legal text. Not legal advice."}
