{"data":{"id":"us-va/4vac25-150-690","jurisdiction":"us-va","citation":"4VAC25-150-690","heading":"Operations plans, coreholes.","body":"In addition to the requirements of 4VAC25-150-100, every operations plan for a corehole shall describe the measures to be followed to protect water quality during the drilling, and the measures to be followed to protect any voids encountered during drilling.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 150. Virginia Gas and Oil Regulation","Part IV. Ground-Disturbing Geophysical Exploration","Article 6. Plugging and Abandonment"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter150/section690/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:22Z","sha256":"ddb99694ade69c56999fce1b86f845d08be14502cfe4039b68022b810b77dd38","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-150-680","next":"us-va/4vac25-150-700"},"notice":"GroundRules: Original legal text. Not legal advice."}
