{"data":{"id":"us-va/4vac25-31-180","jurisdiction":"us-va","citation":"4VAC25-31-180","heading":"Impoundments","body":"The design data and construction plans and specifications for impoundments meeting the criteria set forth in Chapter 13 ( § 45.2-1300 et seq.) of Title 45.2 of the Code of Virginia shall be submitted to the director prior to initiation of construction activities. Such a plan shall be certified as prepared by, or under the supervision of, a registered professional engineer and shall include:\n\n1. Design and construction specifications;\n\n2. Examination and monitoring;\n\n3. Emergency procedures; and\n\n4. Closure and abandonment plans.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 31. Reclamation Regulations for Mineral Mining","Part II. Permit Standards","Article 1. Permits"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter31/section180/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:45:50Z","sha256":"740698c638efda6d06494a9dca8a5792769af453fb9c3bf542e1ca8a6cac3a54","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-31-170","next":"us-va/4vac25-31-190"},"notice":"GroundRules: Original legal text. Not legal advice."}
