{"data":{"id":"us-va/4vac25-31-90","jurisdiction":"us-va","citation":"4VAC25-31-90","heading":"Operator conference with inspector","body":"Prior to approval of a permit application, all maps and plans shall be reviewed at the proposed mining site with the inspector.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 31. Reclamation Regulations for Mineral Mining","Part II. Permit Standards","Article 1. Permits"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter31/section90/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:45:49Z","sha256":"a685c06b28c85add6cc5fc81733693be8dcb4c91b63e1fe1899ac5c9057e9a68","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-31-80","next":"us-va/4vac25-31-100"},"notice":"GroundRules: Original legal text. Not legal advice."}
