{"data":{"id":"us-va/4vac25-40-3870","jurisdiction":"us-va","citation":"4VAC25-40-3870","heading":"Emergency hoisting facilities","body":"Emergency hoisting facilities shall conform to the extent possible to safety requirements for other man hoists, shall be adequate to remove the persons from the mine with a minimum of delay, be maintained in ready condition, and be tested at least every 30 days; records shall be kept of these tests.","path":["Title 4. Conservation And Natural Resources","Agency 25. Department of Energy","Chapter 40. Safety and Health Regulations for Mineral Mining","Part XV. Safety and Health Regulations—Underground Only","Article 6. Loading, Hauling, and Dumping"],"source_url":"https://law.lis.virginia.gov/admincode/title4/agency25/chapter40/section3870/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:06Z","sha256":"d35eebb2d794f85bce00b3354a0ee7e95004d86aea04856973a237ffcee10a0a","source_id":"us-va-vac","stale":false,"prev":"us-va/4vac25-40-3860","next":"us-va/4vac25-40-3880"},"notice":"GroundRules: Original legal text. Not legal advice."}
