{"data":{"id":"us-va/6vac15-81-420","jurisdiction":"us-va","citation":"6VAC15-81-420","heading":"Bids","body":"A. Prior experience with jail construction is an element to be considered when selecting a contractor.\n\nB. After bids for construction have been received and opened, and the owner has determined to proceed with the project, the owner or owner's agent shall submit a copy of the bid tabulation to the reviewing authority.\n\nC. For projects utilizing nontraditional process, other than design-bid-build, the schedule of values shall be submitted within 45 days after award of the construction contract.","path":["Title 6. Criminal Justice And Corrections","Agency 15. State Board of Local and Regional Jails","Chapter 81. Standards for Planning, Design, Construction, and Reimbursement of Local Correctional Facilities","Part III. Project Development","Article 3. Funding and Reimbursement"],"source_url":"https://law.lis.virginia.gov/admincode/title6/agency15/chapter81/section420/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:46:37Z","sha256":"5afa6c6985bf41f407b87c629ad6ed385605f6da2b46cbcdddef5bd0f3ade7e1","source_id":"us-va-vac","stale":false,"prev":"us-va/6vac15-81-410","next":"us-va/6vac15-81-430"},"notice":"GroundRules: Original legal text. Not legal advice."}
