{"data":{"id":"us-va/9vac20-81-400","jurisdiction":"us-va","citation":"9VAC20-81-400","heading":"Applicability","body":"A. No person shall construct, operate, or modify a solid waste management facility in the Commonwealth without a permit issued by the director unless otherwise specified in subsection D of this section or 9VAC20-81-410.\n\nB. Each solid waste management facility permit shall be limited to one site and shall be nontransferable between sites.\n\nC. Issuance of a new permit is required when there is:\n\n1. Any new solid waste management facility;\n\n2. Any change in design or process of a solid waste management facility that will, in the opinion of the director, result in a substantially different type of facility;\n\n3. Any expansion beyond the facility boundary, expansion of the waste management boundary or increase in the capacity of the facility (includes  expansions) specified in the existing permit; or\n\n4. Any expansion beyond the facility boundary for remedial purposes. However, for these types of expansions, which do not provide for additional capacity, the expansion will be considered a permit modification for the purpose of establishing permit fees under the provisions of 9VAC20-90.\n\nD. The director may grant a variance from any provision contained in this part to a permittee provided the requirements of Part VII (9VAC20-81-700 et seq.) of this chapter are met.","path":["Title 9. Environment","Agency 20. Virginia Waste Management Board","Chapter 81. Solid Waste Management Regulations","Part V. Permitting of Solid Waste Management Facilities"],"source_url":"https://law.lis.virginia.gov/admincode/title9/agency20/chapter81/section400/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:48:59Z","sha256":"e67e0ee5372b1d36134c5c1df13311cb6a08b8dfe2b43a27168201958fa61b16","source_id":"us-va-vac","stale":false,"prev":"us-va/9vac20-81-397","next":"us-va/9vac20-81-410"},"notice":"GroundRules: Original legal text. Not legal advice."}
