{"data":{"id":"us-va/9vac20-90-120","jurisdiction":"us-va","citation":"9VAC20-90-120","heading":"Permit application fee schedules","body":"TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.\n\nTYPE OF FACILITY\n\nFEE\n\nAll landfills:\n\nPart A application\n\n$4,180\n\nPart B application\n\n$18,680\n\nIncineration/Energy Recovery Facility\n\n$5,880\n\nTransfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility\n\n$4,310\n\nCompost Facility\n\nFacilities Processing Category I Waste\n\n$6,850\n\nFacilities Processing Waste Categories I, II, or III, or Categories III and Lower\n\n$10,550\n\nFacilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower\n\n$12,670\n\nExperimental Solid Waste Facility\n\n$2,090\n\nPermit-by-rule Initial Review and Confirmation\n\n$390\n\nEmergency Permit\n\n$2,310\n\nTABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.\n\nTYPE OF PERMIT MODULE\n\nFEE\n\nLandfill Part A\n\n$4,180\n\nGeneral - Module I\n\n$390\n\nFacility - Module II\n\n$1,310\n\nLandfill - Module III, IV, or V\n\n$7,050\n\nDesign plan review\n\n$910\n\nLiner design review\n\n$1,960\n\nLeachate system review\n\n$1,310\n\nGas management plan review\n\n$1,700\n\nDrainage plan review\n\n$910\n\nCover design review\n\n$1,830\n\nEquipment\n\n$390\n\nCompost facility - Module VI\n\n$3,660\n\nDesign plan review\n\n$650\n\nLiner design review\n\n$1,310\n\nLeachate system review\n\n$910\n\nDrainage plan review\n\n$650\n\nEquipment\n\n$390\n\nTransfer station - Module VII\n\n$1,180\n\nMaterial recovery facility - Module VIII\n\n$1,570\n\nWaste supply analysis\n\n$650\n\nWaste management areas\n\n$520\n\nWastewater management areas\n\n$390\n\nIncinerator/Energy recovery facility - Module IX\n\n$3,000\n\nWaste and residue storage\n\n$910\n\nOperational requirements\n\n$1,570\n\nWaste control procedures\n\n$520\n\nGroundwater monitoring - Module X or XI\n\n$3,260\n\nWell placement\n\n$1,310\n\nMaterials and specifications\n\n$390\n\nSampling plan\n\n$1,570\n\nClosure - Module XII\n\n$390\n\nPost-closure - Module XIII\n\n$390\n\nCorrective action - Module XIV\n\n$3,000\n\nLeachate handling Module XV\n\n$1,310\n\nRegulated medical waste storage or transfer facility - Module XVI\n\n$390\n\nRegulated medical waste treatment facility - Module XVII\n\n$390\n\nPermit-by-rule Modification Review and Confirmation\n\n$390\n\nPublic participation (does not include costs of newspaper advertisements or radio broadcasts)\n\n$1,040\n\nTABLE 3.1-3. VARIANCE REQUESTS.\n\nTYPE OF VARIANCE\n\nFEE\n\nBase fee for all variances\n\n$390\n\nSupplemental fees based on variance type\n\nExemption from classification as a solid waste\n\n$520\n\nVariance to permitting requirements\n\nSiting requirements\n\n$520\n\nFacility design (other than alternate liner design)\n\n$520\n\nOperational requirements\n\n--\n\nGroundwater monitoring (other than groundwater protection standards and location of monitoring system)\n\n$920\n\nClosure requirements\n\n--\n\nPost-closure requirements\n\n--\n\nGroundwater Protection Standards\n\n--\n\nAlternate liner system design\n\n$1,570\n\nLocation of groundwater monitoring system\n\n$920","path":["Title 9. Environment","Agency 20. Virginia Waste Management Board","Chapter 90. Solid Waste Management Permit Action Fees and Annual Fees","Part III. Determination of Fee Amount"],"source_url":"https://law.lis.virginia.gov/admincode/title9/agency20/chapter90/section120/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:49:00Z","sha256":"a9b525e0dd22c9bca99a638d42fc1d897a7989094494e7c6d67748aa5c040715","source_id":"us-va-vac","stale":false,"prev":"us-va/9vac20-90-117","next":"us-va/9vac20-90-130"},"notice":"GroundRules: Original legal text. Not legal advice."}
