{"data":{"id":"us-va/9vac5-151-50","jurisdiction":"us-va","citation":"9VAC5-151-50","heading":"Designated provisions","body":"Section—Title\n\n40 CFR 93.101 Definitions.\n\n40 CFR 93.102 Applicability.\n\n40 CFR 93.103 Priority.\n\n40 CFR 93.104 Frequency of conformity determinations.\n\n40 CFR 93.106 Content of transportation plans.\n\n40 CFR 93.107 Relationship of transportation plan and TIP conformity with the NEPA process.\n\n40 CFR 93.108 Fiscal constraints for transportation plans and TIPs.\n\n40 CFR 93.109 Criteria and procedures for determining conformity of transportation plans, programs, and projects: General.\n\n40 CFR 93.110 Criteria and procedures: Latest planning assumptions.\n\n40 CFR 93.111 Criteria and procedures: Latest emissions model.\n\n40 CFR 93.112 Criteria and procedures: Consultation.\n\n40 CFR 93.113 Criteria and procedures: Timely implementation of TCMs.\n\n40 CFR 93.114 Criteria and procedures: Currently conforming transportation plan and TIP.\n\n40 CFR 93.115 Criteria and procedures: Projects from a plan and TIP.\n\n40 CFR 93.116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).\n\n40 CFR 93.117 Criteria and procedures: Compliance with PM10 and PM2.5 control measures.\n\n40 CFR 93.118 Criteria and procedures: Motor vehicle emissions budget.\n\n40 CFR 93.119 Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.\n\n40 CFR 93.120 Consequences of control strategy implementation plan failures.\n\n40 CFR 93.121 Requirements for adoption or approval of projects by other recipients of funds designated under Title 23 USC or the Federal Transit Laws.\n\n40 CFR 93.122 Procedures for determining regional transportation-related emissions.\n\n40 CFR 93.123 Procedures for determining localized CO, PM10, and PM2.5 concentrations (hot-spot analysis).\n\n40 CFR 93.124 Using the motor vehicle emissions budget in the applicable implementation plan (or implementation plan submission).\n\n40 CFR 93.125 Enforceability of design concept and scope and project-level mitigation and control measures.\n\n40 CFR 93.126 Exempt projects.\n\n40 CFR 93.127 Projects exempt from regional emissions analyses.\n\n40 CFR 93.128 Traffic signal synchronization projects.\n\n40 CFR 93.129 Special exemptions from conformity requirements for pilot program areas.","path":["Title 9. Environment","Agency 5. State Air Pollution Control Board","Chapter 151. Regulation for Transportation Conformity","Part III. Criteria and Procedures for Making Conformity Determinations"],"source_url":"https://law.lis.virginia.gov/admincode/title9/agency5/chapter151/section50/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:48:45Z","sha256":"9d622fe983f000a946bc84192844435012b866dd2377c7398177e2d1d61ac0e9","source_id":"us-va-vac","stale":false,"prev":"us-va/9vac5-151-40","next":"us-va/9vac5-151-60"},"notice":"GroundRules: Original legal text. Not legal advice."}
