{"data":{"id":"us-va/9vac5-40-5985","jurisdiction":"us-va","citation":"9VAC5-40-5985","heading":"Other permits","body":"A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.\n\n1. Construction of a facility.\n\n2. Reconstruction (replacement of more than half) of a facility.\n\n3. Modification (any physical change to equipment) of a facility.\n\n4. Relocation of a facility.\n\n5. Reactivation (re-startup) of a facility.\n\n6. Operation of a facility.","path":["Title 9. Environment","Agency 5. State Air Pollution Control Board","Chapter 40. Existing Stationary Sources","Part II. Emission Standards","Article 43.1. Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014 (Rule 4-43.1)"],"source_url":"https://law.lis.virginia.gov/admincode/title9/agency5/chapter40/section5985/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:48:14Z","sha256":"90f26593f0f74c920c117f4bbdc0d7d77a9164dab358745cf38c1c9938e4a157","source_id":"us-va-vac","stale":false,"prev":"us-va/9vac5-40-5980","next":"us-va/9vac5-40-5990"},"notice":"GroundRules: Original legal text. Not legal advice."}
