{"data":{"id":"us-va/9vac5-80-610","jurisdiction":"us-va","citation":"9VAC5-80-610","heading":"Fast-track modifications for affected units","body":"A. The following permit revisions are, at the option of the designated representative submitting the permit revision, either fast-track modifications under this section or permit modifications for affected units under 9VAC5-80-600:\n\n1. Incorporation of a compliance option under 9VAC5-80-450 that the designated representative did not submit for approval and comment during the permit issuance process; except that incorporation of a reduced utilization plan that was not submitted during the permit issuance process, that does not designate a compensating unit, and that meets the requirements of 40 CFR 72.43 may use the administrative permit amendment procedures under 40 CFR 72.83.\n\n2. Changes in a substitution plan or reduced utilization plan that result in the addition of a new substitution unit or a new compensating unit under the plan.\n\n3. Addition of a nitrogen oxides averaging plan to a permit.\n\n4. Changes in a Phase I extension plan, repowering plan, nitrogen oxides averaging plan, or nitrogen oxides compliance deadline extension; and\n\n5. Changes in a thermal energy plan that result in any addition or subtraction of a replacement unit or any change affecting the number of allowances transferred for the replacement of thermal energy.\n\nB. The following requirements apply with respect to service, notification, and public participation:\n\n1. The designated representative shall serve a copy of the fast-track modification on the following at least five days prior to the public comment period specified in subdivisions 2 and 3 of this subsection:\n\na. The administrator;\n\nb. The department;\n\nc. Affected states; and\n\nd. Persons on a permit mailing list who have requested information on the opportunity for public comment.\n\n2. Within five business days of serving copies of the fast-track modification under subdivision 1 of this subsection, the designated representative shall give public notice of the fast-track modification by publication in a newspaper of general circulation in the area where the source is located or in a state publication designed to give general public notice. The notice shall contain the information listed in 9VAC5-80-670 C 1 a through C 1 h. The notice shall also state that a copy of the fast-track modification is available (i) from the designated representative and (ii) for public inspection during the entire public comment period at the regional office.\n\n3. The public shall have a period of 30 days, commencing on the date of publication of the notice, to comment on the fast-track modification. Comments shall be submitted in writing to the department and to the designated representative.\n\nC. The timetable for issuance shall be as follows:\n\n1. Within 30 days of the close of the public comment period, the department shall consider the fast-track modification and the comments received and approve, in whole or in part or with changes or conditions as appropriate, or disapprove the modification.\n\n2. A fast-track modification shall be effective immediately upon approval and issuance, in accordance with 9VAC5-80-510 B 5.","path":["Title 9. Environment","Agency 5. State Air Pollution Control Board","Chapter 80. Permits for Stationary Sources","Part II. Permit Procedures","Article 3. Federal Operating Permits for Acid Rain Sources"],"source_url":"https://law.lis.virginia.gov/admincode/title9/agency5/chapter80/section610/","current_through":"2026 Regular Session (effective July 1, 2026)","vintage":"","retrieved_at":"2026-09-14T04:48:34Z","sha256":"4b734c2e8bf036e259fff6a67213b038a614d28c20055abfaadcc8b5ca8eb831","source_id":"us-va-vac","stale":false,"prev":"us-va/9vac5-80-600","next":"us-va/9vac5-80-620"},"notice":"GroundRules: Original legal text. Not legal advice."}
