{"data":{"id":"us-va/va.-code-62.1-44.15-26.1","jurisdiction":"us-va","citation":"Va. Code § 62.1-44.15:26.1","heading":"Termination of Construction General Permit coverage","body":"A. A VSMP authority shall recommend that the Department of Environmental Quality terminate coverage under a General Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) within 60 days of receiving a complete notice of termination from the operator of the construction activity.B. Coverage under a Construction General Permit shall be deemed to be terminated 90 days after the receipt by the VSMP authority of a complete notice of termination from the operator of the construction activity.C. If a VSMP authority receives a notice of termination of a Construction General Permit that it determines to be incomplete, the VSMP authority shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice.2018, c. 630.","path":["Title 62.1. Waters of the State, Ports and Harbors","Chapter 3.1. State Water Control Law","Article 2.3. Virginia Erosion and Stormwater Management Act (VESMA)"],"source_url":"https://law.lis.virginia.gov/vacode/62.1-44.15:26.1/","current_through":"9/4/2026","vintage":"","retrieved_at":"2026-09-04T15:18:04Z","sha256":"653eaaf12fb01019c0435911f8837b66352ee1b8bd0f7175768a43ec0576ed9f","source_id":"us-va","stale":true,"prev":"us-va/va.-code-62.1-44.15-26","next":"us-va/va.-code-62.1-44.15-27"},"notice":"GroundRules: Original legal text. Not legal advice."}