{"data":{"id":"us-wa/rcw-18.104.049","jurisdiction":"us-wa","citation":"RCW 18.104.049","heading":"Modification of construction standards.","body":"The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190.","path":["Title 18","Chapter 18.104"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=18.104.049","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T01:20:08Z","sha256":"0bf2959e15e22f576416e6f7902b3ed8b26cca235250f4f4c996837c7d21af0b","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-18.104.048","next":"us-wa/rcw-18.104.050"},"notice":"GroundRules: Original legal text. Not legal advice."}
