{"data":{"id":"us-wa/rcw-32.32.035","jurisdiction":"us-wa","citation":"RCW 32.32.035","heading":"Requirements of plan of conversion.","body":"The plan of conversion shall contain all of the provisions set forth in RCW 32.32.040 through 32.32.125.","path":["Title 32","Chapter 32.32"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=32.32.035","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:05:01Z","sha256":"c57a246947ea248b5ebdd6ca7994c09867e9e2ca7e395f8b1f937eac7dd8c67d","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-32.32.030","next":"us-wa/rcw-32.32.040"},"notice":"GroundRules: Original legal text. Not legal advice."}
