{"data":{"id":"us-wa/rcw-35.22.362","jurisdiction":"us-wa","citation":"RCW 35.22.362","heading":"Nuclear thermal power facilities—Joint development with public utility districts and electrical companies.","body":"See chapter 54.44 RCW.","path":["Title 35","Chapter 35.22"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=35.22.362","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:08:26Z","sha256":"52bdbef41db5da774a3c5e07279a89276b1ae06da51c53369de2194cf1be5677","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-35.22.360","next":"us-wa/rcw-35.22.365"},"notice":"GroundRules: Original legal text. Not legal advice."}
