{"data":{"id":"us-wa/rcw-36.165.080","jurisdiction":"us-wa","citation":"RCW 36.165.080","heading":"Financing—Permitted inclusions.","body":"The C-PACER financing through a program established under this chapter may include:\n(1) The cost of materials and labor necessary for installation or modification of a qualified improvement;\n(2) Permit fees;\n(3) Inspection fees;\n(4) Lender's fees;\n(5) Program application and administrative fees;\n(6) Project development and engineering fees;\n(7) Third-party review fees, including verification review fees;\n(8) Capitalized interest;\n(9) Interest reserves;\n(10) Escrow for prepaid property taxes and insurance; or\n(11) Any other fees or costs that may be incurred by the property owner incident to the installation, modification, or improvement on a specific or pro rata basis.","path":["Title 36","Chapter 36.165"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=36.165.080","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:34:27Z","sha256":"c3a6eac023481156d42fa275f3b374ac03cf23bc04f9901a4d1100a73f206ca4","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-36.165.070","next":"us-wa/rcw-36.165.090"},"notice":"GroundRules: Original legal text. Not legal advice."}
