{"data":{"id":"us-wa/rcw-36.21.070","jurisdiction":"us-wa","citation":"RCW 36.21.070","heading":"New construction building permits—Appraisal of building.","body":"Upon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.","path":["Title 36","Chapter 36.21"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=36.21.070","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:27:53Z","sha256":"596538531997021129f9a16f52c0db3e3357afabea639d5fc452a3db73eb3f04","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-36.21.015","next":"us-wa/rcw-36.21.080"},"notice":"GroundRules: Original legal text. Not legal advice."}
