{"data":{"id":"us-wa/rcw-36.81.140","jurisdiction":"us-wa","citation":"RCW 36.81.140","heading":"Columbia Basin project road systems—Establishment by plat.","body":"When plats or blocks of farm units have been or are filed under the provisions of chapter 89.12 RCW which contain a system of county roads, or when a supplemental plat of a system of county roads to serve such a plat is filed in connection therewith, the filing period and formal approval by the board of county commissioners shall constitute establishment as county roads: PROVIDED, That the board of county commissioners have obtained the individual rights-of-way by deed or as otherwise provided by law.","path":["Title 36","Chapter 36.81"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=36.81.140","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:32:28Z","sha256":"836672c2531dbac6152e174dacc0b21b0cf63f797a11161d527a43afa7e7dfe3","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-36.81.130","next":"us-wa/rcw-36.82.010"},"notice":"GroundRules: Original legal text. Not legal advice."}
