{"data":{"id":"us-wa/rcw-39.04.170","jurisdiction":"us-wa","citation":"RCW 39.04.170","heading":"Application of chapter to performance-based contracts for energy equipment.","body":"This chapter shall not apply to performance-based contracts, as defined in *RCW 39.35A.020(3), that are negotiated under chapter 39.35A RCW.","path":["Title 39","Chapter 39.04"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=39.04.170","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:37:27Z","sha256":"953087d63aa3241f501c5d5ba76e6bc247a44c8df2b61fbb68bedad7e426bd46","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-39.04.162","next":"us-wa/rcw-39.04.175"},"notice":"GroundRules: Original legal text. Not legal advice."}
