{"data":{"id":"us-wa/rcw-39.04.230","jurisdiction":"us-wa","citation":"RCW 39.04.230","heading":"Correctional facilities construction and repair—Alternative contracting method to remain in force until contracts completed.","body":"Methods of public works contracting authorized by RCW 39.04.210 and 39.04.220 shall remain in full force and effect until completion of projects authorized on or before July 1, 1997.","path":["Title 39","Chapter 39.04"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=39.04.230","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:37:27Z","sha256":"2e9cf0fb9b97b0efde35b1b96d37234d6ca4723f32b64b2b417d3e3abfdc94fe","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-39.04.220","next":"us-wa/rcw-39.04.235"},"notice":"GroundRules: Original legal text. Not legal advice."}
