{"data":{"id":"us-wa/rcw-39.116.030","jurisdiction":"us-wa","citation":"RCW 39.116.030","heading":"Specifications for bid or proposal.","body":"By July 1, 2025, and to the extent practicable, specifications for a bid or proposal for a project contract by an awarding authority may only include performance-based specifications for concrete used as a structural material. Awarding authorities may continue to use prescriptive specifications on structural elements to support special designs and emerging technology implementation.","path":["Title 39","Chapter 39.116"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=39.116.030","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:41:23Z","sha256":"3441d767d0c88c62261509e8a97a9f4698e549217b3458c4e2b4a38c987adcb9","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-39.116.020","next":"us-wa/rcw-39.116.040"},"notice":"GroundRules: Original legal text. Not legal advice."}
