{"data":{"id":"us-wa/rcw-4.16.320","jurisdiction":"us-wa","citation":"RCW 4.16.320","heading":"Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property—Construction.","body":"Nothing in RCW 4.16.300 through 4.16.320 shall be construed as extending the period now permitted by law for bringing any kind of action.","path":["Title 4","Chapter 4.16"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=4.16.320","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T00:29:21Z","sha256":"38ada04584761a482afe6b10e3f1284938aaad39498067e7fa121cb7bf4ec900","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-4.16.310","next":"us-wa/rcw-4.16.325"},"notice":"GroundRules: Original legal text. Not legal advice."}
