{"data":{"id":"us-wa/rcw-4.16.325","jurisdiction":"us-wa","citation":"RCW 4.16.325","heading":"Actions or claims arising from construction defect claims—Statute tolled.","body":"If a written notice of claim is served under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the statutes of limitations for construction-related claims are tolled until sixty days after the period of time during which the filing of an action is barred under RCW 64.50.020.","path":["Title 4","Chapter 4.16"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=4.16.325","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T00:29:21Z","sha256":"11b2695d86ca2fd7e74d16f7849f7fc0fcff74cc73432f7f134204f564338feb","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-4.16.320","next":"us-wa/rcw-4.16.326"},"notice":"GroundRules: Original legal text. Not legal advice."}
