{"data":{"id":"us-wa/rcw-4.24.380","jurisdiction":"us-wa","citation":"RCW 4.24.380","heading":"Construction contract provision waiving, releasing, etc., rights of contractor, etc., to damages or adjustment for unreasonable delay caused by contractee, etc.—Prospective application of RCW 4.24.360.","body":"The provisions of RCW 4.24.360 shall apply to contracts or agreements entered into after September 1, 1979.","path":["Title 4","Chapter 4.24"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=4.24.380","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T00:29:43Z","sha256":"ac304c8e0b06fbcaa6f30faedef6878d048b5f3fa485befd0f85e000f26ca991","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-4.24.370","next":"us-wa/rcw-4.24.400"},"notice":"GroundRules: Original legal text. Not legal advice."}
