{"data":{"id":"us-wa/rcw-43.21a.610","jurisdiction":"us-wa","citation":"RCW 43.21A.610","heading":"Steam electric generating plant—Study—Construction.","body":"The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him or her to be feasible and operate it as a state owned facility.","path":["Title 43","Chapter 43.21A"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=43.21A.610","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:47:57Z","sha256":"475c391334288dc6b6e6b6a1273ab4bb1218796dcd77482a93fc6967b1916be5","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-43.21a.608","next":"us-wa/rcw-43.21a.612"},"notice":"GroundRules: Original legal text. Not legal advice."}