{"data":{"id":"us-wa/rcw-43.52.560","jurisdiction":"us-wa","citation":"RCW 43.52.560","heading":"Contracts for materials or work required—Sealed bids.","body":"Except as provided otherwise in this chapter, a joint operating agency shall purchase any item or items of materials, equipment, or supplies, the estimated cost of which is more than $30,000 exclusive of sales tax, or order work for construction of generating projects and associated facilities, the estimated cost of which is more than $150,000 exclusive of sales tax if more than a single craft or trade is involved, or $75,500 exclusive of sales tax if only a single craft or trade is involved, by contract in accordance with RCW 54.04.070 and 54.04.080, which require sealed bids for contracts.","path":["Title 43","Chapter 43.52"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=43.52.560","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:18:35Z","sha256":"746e9ea045abbdf84f87c868a675db064a22c3295e6d2dfd6f0e79451049dcaa","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-43.52.550","next":"us-wa/rcw-43.52.565"},"notice":"GroundRules: Original legal text. Not legal advice."}
