{"data":{"id":"us-wa/rcw-47.01.417","jurisdiction":"us-wa","citation":"RCW 47.01.417","heading":"State route No. 520 improvements—Finance plan—Revenue sources and savings recognition.","body":"The state route number 520 bridge replacement and HOV project finance plan must include:\n(1) Recognition of revenue sources that include: One billion seven hundred million dollars in state and federal funds allocated to the project; one billion five hundred million dollars to two billion dollars in tolling revenue, including early tolls that could begin in late 2009; eighty-five million dollars in federal urban partnership grant funds; and other contributions from private and other government sources; and\n(2) Recognition of savings to be realized from:\n(a) Potential early construction of traffic improvements from the eastern Lake Washington shoreline to 108th Avenue Northeast in Bellevue;\n(b) Early construction of a single string of pontoons to support two lanes that are for transit and high occupancy vehicle travel and four general purpose lanes;\n(c) Preconstruction tolling to reduce total financing costs; and\n(d) A deferral of the sales taxes paid on construction costs.","path":["Title 47","Chapter 47.01"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=47.01.417","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T03:01:42Z","sha256":"5d8855fba381b52b358b53a44410b7fcaefbb2e9772f04b2826751e81d83dfe1","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-47.01.415","next":"us-wa/rcw-47.01.419"},"notice":"GroundRules: Original legal text. Not legal advice."}
