{"data":{"id":"us-wa/rcw-47.04.100","jurisdiction":"us-wa","citation":"RCW 47.04.100","heading":"Temporary route pending construction of new highway—Streets, roads not to be maintained as.","body":"Unless otherwise provided, whenever by statute a new highway or extension is added to the state highway system, no existing city street or county road may be maintained or improved by the department as a temporary route of such new highway or extension pending the construction of the new highway or extension on the location adopted by the department.","path":["Title 47","Chapter 47.04"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=47.04.100","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T03:08:04Z","sha256":"a9c95347a0a446e0f429466e26f46befc8c37671920b32eb3134a5579b7bd51b","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-47.04.095","next":"us-wa/rcw-47.04.125"},"notice":"GroundRules: Original legal text. Not legal advice."}
