{"data":{"id":"us-wa/rcw-47.56.902","jurisdiction":"us-wa","citation":"RCW 47.56.902","heading":"Interstate 5 bridge replacement project—Toll facility. (Contingent effective date.)","body":"(1) For the purposes of this section and RCW 47.56.904 and 47.56.906 and section 8, chapter 377, Laws of 2023, \"Interstate 5 bridge replacement project\" means the bistate, multimodal corridor improvement program between the state route number 500 interchange in Vancouver, Washington and the Victory Boulevard interchange in Portland, Oregon.\n(2) The Interstate 5 bridge replacement project is designated an eligible toll facility. Tolls are authorized to be imposed on the Interstate 5 bridge replacement project. Tolls may be charged for travel only on the existing and replacement Interstate 5 Columbia river bridges. Tolls may not be charged for travel on the Washington state portion of Interstate 205. Toll revenue generated on the Interstate 5 bridge replacement project must be expended only as allowed under RCW 47.56.820.","path":["Title 47","Chapter 47.56"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=47.56.902","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T03:07:47Z","sha256":"a1fed528f5ee149463592465c4b0f4fa4bdc47e57a2376ba6bde64854cfa92bc","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-47.56.900","next":"us-wa/rcw-47.56.904"},"notice":"GroundRules: Original legal text. Not legal advice."}
