{"data":{"id":"us-wa/rcw-47.60.377","jurisdiction":"us-wa","citation":"RCW 47.60.377","heading":"Vessel rebuild and replacement plan.","body":"The department shall develop and maintain a vessel rebuild and replacement plan that, at a minimum:\n(1) Includes projected retirement dates for all vessels, distinguishing between active and inactive vessels;\n(2) Includes projected rebuild dates for all vessels;\n(3) Includes timelines for vessel replacement, including business decisions, design, procurement, and construction; and\n(4) Includes a summary of the condition of all vessels, distinguishing between active and inactive vessels.","path":["Title 47","Chapter 47.60"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=47.60.377","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T03:07:53Z","sha256":"87736f764dc72412ea5fc6e82c44561b5ae73aafe40af26111477e9605d4ca26","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-47.60.375","next":"us-wa/rcw-47.60.385"},"notice":"GroundRules: Original legal text. Not legal advice."}
