{"data":{"id":"us-wa/rcw-54.40.030","jurisdiction":"us-wa","citation":"RCW 54.40.030","heading":"Transmittal of copies of federal hydroelectric license to county auditor.","body":"Within five days after a public utility district shall receive a license from the federal power commission to construct a hydroelectric project of an estimated cost of more than two hundred and fifty million dollars, including interest during construction, or, in the case of a district which on September 21, 1977, is in existence and has such a license within five days of September 21, 1977, the district shall forward a true copy of said license, certified by the secretary of the district, to the county auditor of the county wherein said district is located.","path":["Title 54","Chapter 54.40"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=54.40.030","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T03:32:09Z","sha256":"325ac0485752c329247c17d7f96e82826a4bbfeb101c746af58d006d8201a2a5","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-54.40.020","next":"us-wa/rcw-54.40.040"},"notice":"GroundRules: Original legal text. Not legal advice."}
