{"data":{"id":"us-wa/rcw-7.24.030","jurisdiction":"us-wa","citation":"RCW 7.24.030","heading":"Construction of contracts.","body":"A contract may be construed either before or after there has been a breach thereof.","path":["Title 7","Chapter 7.24"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=7.24.030","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T00:37:27Z","sha256":"c5f2284f5cfbcaf66047eaf9b8d71af949b63630d1f806d814c0aa66b15a26e4","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-7.24.020","next":"us-wa/rcw-7.24.050"},"notice":"GroundRules: Original legal text. Not legal advice."}
