{"data":{"id":"us-wa/rcw-77.55.251","jurisdiction":"us-wa","citation":"RCW 77.55.251","heading":"Mitigation plan review.","body":"When reviewing a mitigation plan under RCW 77.55.021, the department shall, at the request of the project proponent, follow the guidance contained in RCW 90.74.005 through 90.74.030.","path":["Title 77","Chapter 77.55"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=77.55.251","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T02:16:30Z","sha256":"d5bfe919da43a71bcce9c31150c390ccddae980812b26325499fe0e4b460f172","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-77.55.241","next":"us-wa/rcw-77.55.261"},"notice":"GroundRules: Original legal text. Not legal advice."}
